Although, engineering, supply line, manufacturing and project management are the life lines of the Company, it is also supported by several functions such as IT, Finance, Human Resources, Marketing, Administration etc. Each division is monitored and guided by the professional manpower having independent HOD to look after the day to day functions of division. The Company has successfully executed following major Turnkey projects :
S. No. |
Description of Project |
Client |
Year of completion |
1 |
Supply/Erection contract for execution of works of feeder separation, strengthening of sub-transmission & distribution system (ST&D) including metering of feeders & consumers/rural electrification and domestic connections in Barmer District Lot-VI (Sindhari Block) under DDUGJY on turnkey basis against package No.TNTW-356 |
JDVVNL, Jodhpur |
2019 |
2 |
Rural Electricity under DDUGJY Scheme |
AVVNL, Sikar |
2018 |
3 |
Rural Electricity under DDUGJY Scheme |
AVVNL, Jhunjhun |
2018 |
4 |
Construction of 132 KV Sub-station Gangaicha Jat, 66 KV Sub-stations Rundhi & Sector 2, Palwal on Turnkey basis under REC-116 |
Haryana Vidyut Prasaran Nigam Ltd., Panchkula (Haryana) |
2014 |
5 |
Construction of 03 Nos. 132KV Line Bays at 132KV Sub-station Nangal Mohanpur and 01 No. 132KV Bay at 220KV Sub-station Dhanonda on turnkey basis in the State of Haryana against Package B Tender Enquiry No.REC-125. |
Haryana Vidyut Prasaran Nigam Ltd., Panchkula (Haryana) |
2015 |
6 |
Construction of 132/33KV Sub-station, Dankaur (GB Nagar) on turnkey basis |
Uttar Pradesh Power Transmission Corporation Ltd. (UPPTCL), Lucknow (U.P.) |
2016 |
7 |
Construction of 132/33KV Sub-station, Morna (Bijnore) on turnkey basis |
Uttar Pradesh Power Transmission Corporation Ltd. (UPPTCL), Lucknow (U.P.) |
2017 |
8 |
Construction of 11KV Feeder Line for illumination of major bridges, duty huts and LC gates including construction of pole mounted electrical sub-station/ isolation points along with railway track on Qazigund - Baramullah Section of USBRL Project (J & K). |
IRCON International Ltd., Tulsi Bagh, Sri Nagar (J & K). |
2014 |
9 |
Electrical work for HT side for 5 X 10 MW Solar PV Project at Village That,Rajasthan. Teshil - Pokaran, Dist. Jaisalmer, (Solar) |
Today Green Energy Pvt. Ltd., Delhi |
2015 |
10 |
Supply, Installation, Testing and Commissioning of 66KV Switchyard for 21.5MW Punjloyd Project at Village: Gamiwala, Boha, District: Mansa (Punjab) (Solar) |
Jakson/Punjllyod |
2015 |
11 |
33/11KV S/Stn for Constn. Power inclg. LT S/Stn 11KV Ring Main for NTPC / NSTPP, Nabinagar, Dist: Aurangabad, Bihar |
Nabinagar Power Generating Co., Patna (Bihar). |
2014 |
12 |
BPIs inclg. Structure Terminal Connector etc. in between CVTs LAs in all the 400KV lines connected to Hisar Sub-station |
Power Grid Corporation of India Ltd., Jammu. |
2014 |
13 |
33KV Bay Equipments for Replacement of 33KV Bays for Charging of 25MVAR Shunt Reactor at Moga 400KV/220KV Substation |
Power Grid Corporation of India Ltd., Jammu. |
2014 |
14 |
Subcontract of Civil Work for proposed extension of Switchyard its Associated Works for 400/ 220KV Substation of Power Grid Corporation of India Limited at Bahadurgarh, Haryana. |
ABB Limited, Faridabad. |
2013 |
15 |
Turnkey execution of shifting of 400KV Hissar-Bawana 400KV Bahadurgarh- Bawana lines of POWERGRID from existing 400KV Bawana Switchyard (DTL) to adjacent Combined Cycle Gas Turbine (CCGT) Switchyard of Pragati Power Corporation Ltd. (PPCL) |
Power Grid Corporation of India Ltd., Gurgaon. |
2013 |
16 |
11KV Distribution System associated LT works Rate Contract for Financial Year 2010-11 to 2012-13 |
Tata Power Delhi Distribution Ltd. (TPDDL) formerly known as North Delhi Power Ltd. (NDPL) |
2013 |
17 |
Turnkey execution of Design, Engineering, Supply, Testing and Commissioning of Distribution Sub-station for Conversation of 6.6KV System to 11KV System at Chandrawal Water Works-1 |
Tata Power Delhi Distribution Ltd. (TPDDL) formerly known as North Delhi Power Ltd. (NDPL) |
2012 |
18 |
Erection of 132KV Single Circuit Line from Nuna Majra to MIE Bahadurgarh |
Hindustan National Glass Industries Ltd., Ballabhgarh. |
2012 |
19 |
Civil work for 132KVA Substation, Bahadurgarh |
Hindustan National Glass Industries Ltd., Ballabhgarh |
2012 |
20 |
Work for 132KV Sending Bay |
2012 |
|
21 |
Electrification Job at Budge-Budge Terminal-I, Kolkata. |
Hindustan Petroleum Corporation of India Ltd., Mumbai |
2012 |
22 |
Survey, Supply, Erection, Testing Commissioning. on Turnkey basis 11 kV Feeder Renovation Program AVVNL Sikar (Rajasthan) |
Ajmer Vidyut Vitran Nigam Ltd., Ajmer |
2012 |
23 |
Turnkey execution of Supply Erection Testing Commissioning of equipments for REC in Narmada Distt., Gujrarat under Govt, of India scheme of Rajiv Gandhi Grameen Vidyuti Karan Yojana |
Power Grid Corporation of India Ltd., Gurgaon. |
2010 |
24 |
Execution of Bay Extension Works in existing 66KV & 33KV Sub-stations. |
Tata Power Delhi Distribution Ltd. (TPDDL) formerly known as North Delhi Power Ltd. (NDPL) |
2009 |
25 |
Renovation & Modernization and augmentation of capacities of various existing 33/11KV Sub Station of Electricity Distribution Circle, Bulandshahr & Khurja under APDRP scheme |
Paschimanchal Vidyut Vitran Nigam Ltd (PVVNL), Meerut (U.P.) |
2009 |
26 |
Conversion of 66KV System to 33KV System at 66KV Substation Janak Nagar in Saharanpur under APDRP scheme |
Paschimanchal Vidyut Vitran Nigam Ltd (PVVNL),Meerut (U.P.) |
2009 |
27 |
Survey, Design, Supply, Erection, Testing & Commissioning. of Pole Mounted works & HVDS Distribution system works |
Tata Power Delhi Distribution Ltd. (TPDDL) formerly known as North Delhi Power Ltd. (NDPL) |
2009 |
28 |
Supply, ETC of equipments/material required for remodeling of 66/ 11 kV PP-2 Grid Substation |
Tata Power Delhi Distribution Ltd. (TPDDL) formerly known as North Delhi Power Ltd. (NDPL) |
2009 |
29 |
Construction of 33/11kV Sub-station (2X7.5MVA) at Barrage & Plant site Including civil work Control Room Building for Tapovan Vishnugad Hydro Power Project on Turnkey Basis |
NTPC Ltd., Joshimath (Uttrakhand) |
2008 |
S.No. |
Description of Project |
Client |
Contract Value |
Status |
1. |
PGCIL(765/400KV AIS Bhiwani Ext.) |
Power Grid Corporation of India Ltd., Bhiwani, Haryana |
2.80 |
On going |
2. |
Civil Works for AIS Pkg. S.S30 for 765/400kV Fatehgarh-II New S/Stn. |
Power Grid Corporation of India Ltd., Fatehgarh, Rajasthan |
17.62 |
On going |
3. |
Supply, Erection, Testing and Commissioning of Electrical & Civil Works for Construction Power Package 2X660 MW THDC Khurja Thermal Power Project |
L&T-MHPS Boilers Pvt. Ltd. |
7.24 |
On going |
4. |
Supply, Erection, Civil, Testing and Commissioning of Equipments for Construction of 3 Nos. 220 KV line bays at 220 KV AIS S/Stn. Narnaul and 2 No. 220 KV line bays at 400/ 220 KV AIS S/ Stn. Dhanonda on Turnkey basis |
Haryana Vidyut Prasaran Nigam Ltd., Panchkula (Haryana) |
5.10 |
On going |
5. |
Construction of 66 kV GIS S/Stn. Sec-37 Faridabad with 2x25/31.5 MVA 66/11 kV Power Transformers (2x25/31.5 MVA 66/11kV T/f will be supplied by HVPNL) on Turnkey basis |
Haryana Vidyut Prasaran Nigam Ltd., Panchkula (Haryana) |
16.50 |
On going |
6. |
Rural Electrification works of Koraput District in Odisha State under RGGVY (12th Plan) |
NTPC Limited, Bhubaneshwar, Odisha |
23.00 |
On going |
7. |
Rural Electrification works of Puri District in Odisha State under RGGVY (12th Plan) |
NTPC Limited, Bhubaneshwar, Odisha |
159.36 |
On going |
8. |
Supply of materials/equipments complete with all facilities for execution of works (Engineering, supply, erection of HT (33kv/11kv UG cable and lines), VCB's, New/augmentation of DTRs and Network up-gradation, New/augmentation of LT cable, Metering) in the Cuttack town under the RAPDRP Scheme |
Central Electricity Supply Utility of Odisha (CESU), Odisha |
80.95 |
At the stage of completion |
9. |
Execution of Works related to supply and errection of material for 36 KM 33 KV single Circuit line on lattice tower from 132 KV GSS Sindhari to PHED AdelDistt. Barmer on turnkey basis against TN TW- 431 |
JDVVNL, Jodhpur, Rajasthan |
4.49 |
On going |
10. |
Execution of the works realting to provide last mile connectivity and electricity connection to all remaining house hold under pradhan mantri sahaj bijali har ghar yojna(Saubhagya) in Sindhari Block of Barmer District on turnkey basis against TN TW-452 |
JDVVNL, Jodhpur, Rajasthan |
25.65 |
On going |